The 15,000 SF, two-story facility will serve as the new home for Valley Metro, the new headquarters for the Edinburg Economic Development Corporation, and various lease spaces. Chanin Engineering provided the structural design for the two-story transit terminal consisting of masonry, conventional steel and pre-cast concrete; the two retail buildings located on the south side of the terminal consisting of masonry and conventional steel; the four bus stop canopies designed of conventional steel; and a masonry monument sign located at the front entrance. This project is currently under construction.
Chanin Engineering. Another Brilliant Design By Fantich Media.